Skip to main content
MDRC – Medical Devices Regulatory Compliance

MDR · IVDR · Annex I · Annex II

General safety and performance requirements

Turn Annex I into a controlled evidence map linking the intended purpose, risk controls, verification and validation, clinical or performance evidence, labelling and post-market information.

What GSPR conformity actually means

GSPR are the legal safety and performance requirements in Annex I of the MDR and IVDR. Conformity is not established by checking a box. The manufacturer must determine applicability, choose a valid conformity method and identify the controlled evidence.

01

Product-specific

Applicability follows the intended purpose, users, environment, technologies, materials, operating principle and foreseeable risks.

02

Evidence-based

Each applicable requirement needs a defined method and evidence that covers the released device and its claimed performance.

03

Traceable

The matrix should identify exact document numbers, versions, sections and locations rather than broad folders or generic files.

04

Maintained

Design changes, revised standards and post-market information can change the applicability assessment or invalidate earlier evidence.

MDR and IVDR follow the same architecture, not the same numbering

Both Annexes contain general requirements, design and manufacture requirements, and requirements for information supplied with the device. Their detailed provisions reflect different product types.

Medical devices

MDR Annex I

23 numbered requirements
  1. Chapter I

    General requirements

    Requirements 1–9

  2. Chapter II

    Design and manufacture

    Requirements 10–22

  3. Chapter III

    Information supplied

    Requirement 23

The conformity rationale connects risk management and verification to clinical evaluation under Article 61 and Annex XIV.

In vitro diagnostic devices

IVDR Annex I

20 numbered requirements
  1. Chapter I

    General requirements

    Requirements 1–8

  2. Chapter II

    Design and manufacture

    Requirements 9–19

  3. Chapter III

    Information supplied

    Requirement 20

Demonstration of conformity includes performance evaluation under Article 56 and Annex XIII, covering scientific validity, analytical performance and clinical performance.

I

Safety, performance and risk

Intended performance, benefit-risk acceptability, risk management, lifetime, foreseeable use, transport and storage.

II

Design and manufacture

Product-specific technical provisions for materials, contamination, software, measurement, energy and other relevant technologies.

III

Information supplied

Identification, labels, packaging information and instructions for use aligned with residual risks and the intended user.

Build the matrix from the device outward

Start with the released product definition. A generic template cannot determine applicability, appropriate test methods or the evidence needed for a particular configuration and claim set.

01

Define

Intended purpose, users, variants, accessories and claims

02

Assess

Applicability and documented reasons for exclusions

03

Control

Hazards, risk controls and residual-risk communication

04

Demonstrate

Testing, evaluation, validation and controlled records

05

Maintain

Changes, PMS signals and current state of the art

Annex II requires more than a yes or no

The technical documentation must identify the applicable GSPR, explain why other requirements do not apply, describe the conformity methods, list standards or common specifications used and identify the controlled evidence and its location.

Record six decisions for every requirement

The GSPR matrix should function as an index into the technical documentation. It should remain precise enough for an independent reviewer to follow the conformity argument without guessing.

01

Requirement

Exact MDR or IVDR Annex I clause and subclause

02

Applicability

Applicable or not applicable with a product-specific reason

03

Method

How conformity is demonstrated for this device

04

Technical basis

Standards, common specifications or another justified solution

05

Evidence

Controlled report, record, specification, evaluation or drawing

06

Location and status

Document identifier, version, section, approval and dossier location

Illustrative record

Trace the requirement to released evidence

Clause
Exact Annex I reference
Decision
Applicable to defined configurations and users
Method
Risk control plus verification against defined acceptance criteria
Evidence
Approved protocol, report and linked risk-management records

The example shows the structure of a record. The clause, method and evidence must be selected for the actual device and requirement.

One requirement may depend on several evidence streams

Evidence categories overlap. The relevant set depends on the device, and the same record may support several clauses when its scope and acceptance criteria are suitable.

Risk

Risk management

Hazards, risk controls, benefit-risk conclusions and residual-risk communication

Design

Verification and validation

Specifications, test methods, acceptance criteria, reports and configuration control

Biology

Materials and biological safety

Material characterisation, toxicological assessment and biological evaluation where relevant

Process

Sterility and packaging

Microbiological controls, validated processes, packaging integrity and shelf-life evidence

Digital

Software and cybersecurity

Lifecycle records, architecture, verification, usability, security controls and maintenance

Human

Usability and information

User profiles, use-related risks, validation, labels, instructions and training assumptions

Clinical

Clinical or performance evidence

Clinical evaluation for MDR or scientific-validity, analytical and clinical-performance evidence for IVDR

Lifecycle

PMS, PMCF or PMPF

Post-market data that confirms or challenges risk, performance and conformity conclusions

Use standards as methods, not as substitutes for the requirement

A standard can structure the method and acceptance criteria, but the manufacturer remains responsible for showing that the result covers the applicable legal requirement and the actual device.

01

Harmonised standards

A cited harmonised standard can provide presumption of conformity only for the requirements and aspects covered by its Official Journal reference.

02

Other standards

Non-harmonised or international standards may support the state of the art and a conformity method, but do not themselves create EU presumption of conformity.

03

Common specifications

Where an applicable common specification has been adopted, its requirements and any justified alternative solution need explicit treatment in the conformity rationale.

04

Controlled application

Record the edition, clauses applied, deviations, acceptance criteria and the device configurations covered by the evidence.

Do not relabel an old Essential Requirements checklist

MDD, AIMDD and IVDD used the term Essential Requirements. MDR and IVDR use General Safety and Performance Requirements. The change is not merely terminological. The scope, numbering and detail expanded, and the MDR and IVDR Annexes differ from each other.

A transition review should reassess applicability and evidence against the correct Regulation. Renaming columns while retaining Directive-era logic can leave new requirements and changed evidence expectations uncovered.

A complete spreadsheet can still contain an incomplete argument

Review quality depends on the traceability and validity of the reasoning, not the percentage of populated cells.

01

Generic applicability

Decisions copied from a template without reference to the actual device

02

Unsupported exclusions

Not applicable entries with no technical or regulatory justification

03

Uncontrolled references

Document titles without identifiers, versions, approval status or location

04

Standard-only claims

A certificate or standard citation presented as if it were device evidence

05

Broken alignment

Claims, risks, testing, clinical evidence and labelling describe different scopes

06

Frozen conclusions

The matrix is not reviewed after changes, complaints, vigilance or new evidence

Keep the GSPR conclusion connected to change and post-market data

The matrix should be reviewed through design control and the QMS, not recreated only when a submission or audit is approaching.

Design input

Translate applicable legal requirements into controlled specifications

Development

Connect risks, controls, verification and evaluation activities

Release

Confirm approved evidence covers the commercial configuration

Change

Reassess applicability, standards, evidence and labelling impact

Post-market

Feed PMS, vigilance, PMCF or PMPF findings back into conformity

GSPR in practice

The central distinction is between recording a conclusion and controlling the evidence that supports it.

Does every Annex I requirement apply to every device?

No. Applicability depends on the intended purpose, device characteristics, users, use environment, technologies and risks. Each exclusion should have a product-specific justification.

Is a completed GSPR checklist sufficient evidence?

No. The matrix is an index and control tool. It should identify the method and the precise controlled documents containing the evidence.

Are harmonised standards mandatory?

Their use is generally voluntary. A standard cited in the Official Journal can create a presumption of conformity only within the scope covered by its reference. Alternative solutions require an adequate rationale.

How many numbered GSPR are in MDR and IVDR Annex I?

MDR Annex I contains 23 numbered requirements. IVDR Annex I contains 20. Both have three chapters, but the detailed provisions and numbering differ.

Does a test report prove GSPR conformity?

Only within its defined scope. The tested configuration, method, acceptance criteria and result must match the released device and the conformity claim being made.

When should the matrix be updated?

Review it after relevant product, process, supplier, standard, evidence or labelling changes and whenever post-market information may affect the conformity conclusion.

Build a GSPR matrix that can withstand independent review

MDRC can define applicability, map methods and evidence, identify gaps and align the matrix with risk management, verification, clinical or performance evaluation, labelling and post-market controls.

Discuss your GSPR evidence