Define
Set the scope, process owners, responsibilities, interfaces, criteria and required records.
MDR · IVDR · ISO 13485 · FDA QMSR
Build a QMS that controls the work, supports the product and produces reviewable evidence.
Regulatory strategy
Markets, routes and obligationsProduct realization
Design, supply and productionLifecycle evidence
Risk, clinical, performance and PMSImprovement
CAPA, audit and management reviewThe operating principle
It is the controlled way an organisation converts requirements into decisions, work and evidence. The documents define the system. Daily practice and records demonstrate that it operates.
Set the scope, process owners, responsibilities, interfaces, criteria and required records.
Use the controlled processes in design, supply, production, release and lifecycle activities.
Retain objective evidence that trained people followed the process and reached traceable decisions.
Use data, audits, CAPA and management review to correct weaknesses and improve effectiveness.
Service scope
We can design a new QMS, remediate an existing system or prepare a defined process set for certification, notified-body assessment or FDA inspection readiness.
Define the project scopeLegal-manufacturer activities, sites, device portfolios, target markets, outsourced processes, exclusions and process interactions.
Quality policy, objectives, responsibilities, document control, record control, change control, training and competence.
Planning, inputs, outputs, reviews, verification, validation, transfer, release and control of design or process changes.
Risk-based supplier qualification, purchasing controls, outsourced-process oversight, production controls and acceptance records.
Risk management, clinical or performance evaluation, technical documentation, registration, UDI, PMS, vigilance and field action.
Complaints, nonconformity, data analysis, CAPA, internal audit, management review and effectiveness checks.
MDR and IVDR system coverage
Article 10 of the MDR and IVDR requires a documented and maintained QMS that is proportionate to the device risk class and type. The system must cover the applicable regulatory and lifecycle processes.
Conformity-assessment routes, significant changes, market access and controlled compliance planning
Identification of legal requirements and methods for addressing the GSPR
Responsibilities, competence, infrastructure, objectives and management oversight
Selection, controls, monitoring and evidence for outsourced activities
Risk management, clinical or performance evaluation and post-market follow-up
Planning, design, development, production, service and controlled changes
UDI, registration, EUDAMED, PMS, vigilance and field safety corrective action
Nonconformity, CAPA, effectiveness checks and continual improvement
Process architecture
Strategy · policy · objectives · resources · management review
Regulatory planning · design and development · supply · production · release · market support
Documents · records · competence · infrastructure · suppliers · software · data integrity
Complaints · PMS · audit · nonconformity · CAPA · data analysis · effectiveness
A procedure belongs in the architecture only when its inputs, outputs, owner, controls, records and interfaces are understood.
Framework comparison
ISO 13485, the EU Regulations and the FDA QMSR are related, but they are not interchangeable labels. The QMS must show which requirement each process addresses and which jurisdiction-specific controls remain.
A certifiable medical-device QMS framework for consistent product and regulatory-process control.
Binding manufacturer obligations that connect the QMS to the device, technical documentation and conformity assessment.
Effective since 2 February 2026, the QMSR incorporates ISO 13485:2016 by reference and retains FDA-specific provisions.
An ISO 13485 certificate can support confidence in the QMS. It does not, by itself, establish compliance with every applicable MDR, IVDR or FDA requirement.
Working method
Confirm the legal manufacturer, sites, products, lifecycle stages, target markets and assessment objectives.
Map existing processes, documents, records, responsibilities, software, outsourced activities and gaps.
Set process ownership, interactions, controls, criteria, templates and the hierarchy of controlled information.
Draft proportionate procedures and forms that reflect the organisation’s actual operating model.
Release documents, assign responsibilities, train users and begin generating objective evidence.
Review records, perform an internal audit, address findings and confirm process effectiveness.
Present system data, decisions, resource needs and improvement actions to top management.
Reconcile evidence, test traceability and support certification, notified-body or inspection readiness.
Engagement models
We can work alongside your quality and regulatory team or take responsibility for a defined QMS work package with agreed inputs, deliverables and decision points.
Create a proportionate system for a new manufacturer, product programme or market-entry strategy.
Resolve audit findings, disconnected processes, excessive documentation or evidence gaps.
Prepare for ISO 13485 certification, notified-body assessment or FDA inspection through staged implementation and testing.
Maintain selected processes, conduct internal audits, support CAPA and keep the QMS aligned with organisational change.
Common failure patterns
Findings recur when a procedure is revised but ownership, data, competence or the connected process remains unchanged.
Templates describe an organisation that does not exist
Procedures and daily practice use different workflows
Process owners cannot explain their inputs, outputs or records
Risk, clinical, performance and PMS conclusions are disconnected
Supplier controls do not reflect product or process risk
Implementation is claimed without objective evidence or effectiveness checks
Connected services
Connect QMS controls to the released device and its Annex II and Annex III records.
Build the lifecycle feedback system that informs action and file updates.
Control the clinical evidence process and its interfaces with risk and PMS.
Regulatory basis
The final QMS scope remains organisation and device specific. These official sources establish the principal frameworks used to define it.
Article 10 manufacturer obligations and Annex IX QMS assessment
Article 10 manufacturer obligations and Annex IX QMS assessment
Official ISO overview of the medical-device quality-management standard
Current FDA information on QMSR and incorporation of ISO 13485:2016
Questions in practice
The MDR and IVDR require manufacturers to establish, document, implement, maintain and continually improve a QMS. They do not make possession of an ISO 13485 certificate a universal condition for every manufacturer. The applicable conformity-assessment route, device class and notified-body involvement must be assessed for the specific device.
No. ISO 13485 provides a medical-device QMS framework, but MDR and IVDR compliance also depends on applicable legal obligations, device-specific technical documentation, clinical or performance evidence, post-market activities and the relevant conformity-assessment procedure.
Yes. One controlled QMS can cover MDR and IVDR activities when its scope, responsibilities, procedures and records distinguish the applicable device types, classifications, evidence processes and regulatory requirements.
The QMS is the operating system of responsibilities, processes, controls and records. A quality manual is one controlled document that describes the system and its scope. A manual alone does not demonstrate implementation.
The FDA Quality Management System Regulation became effective on 2 February 2026 and incorporates ISO 13485:2016 by reference. Manufacturers must also address the applicable FDA-specific requirements in 21 CFR Part 820 and other relevant FDA regulations.
The schedule depends on the company scope, device lifecycle, existing controls, team availability and target assessment date. A realistic plan includes not only document creation but also training, operation, records, internal audit, corrective action and management review.
Start with the operating model
Tell us the organisation, device portfolio, target markets, current QMS status and next assessment milestone. We will propose a focused scope.