Skip to main content
MDRC – Medical Devices Regulatory Compliance

MDR · IVDR · Day-to-day data management

PMS that works between reporting dates

We turn fragmented market experience into a controlled process with defined data owners, review intervals, escalation criteria and documented decisions.

MDRC can establish the PMS operating model, perform agreed activities or support individual reporting cycles. The manufacturer retains responsibility and approves decisions while we provide the method, analysis and traceable outputs.

ModeContinuous process FoundationControlled data OutputReasoned decision

Build a working rhythm, not only a reporting calendar

The system must recognise relevant change when it occurs. We therefore separate the continuous data flow, scheduled review and regulatory escalation.

01

Continuous intake

Define the sources, owners, transfer format and controls for data completeness.

Complaints · incidents · sales · literature · PMCF or PMPF
02

Regular review

Compare signals with exposure, known risks, previous periods and completed actions.

Trends · deviations · new risks · action effectiveness
03

Controlled escalation

Record the trigger, assessment, accountable decision, deadline and affected documents.

Investigation · CAPA · vigilance · FSCA · documentation change

Assign defined functions without losing control

Support may begin with one reporting cycle or extend to the regular operation of the complete process. Boundaries and authority are documented before work starts.

01

Source map

Review of data coverage, responsible functions, transfer frequency and links to specific devices.

02

Processing rules

Common categories, required fields, deduplication, exposure links and quality control of records.

03

Signal review

Periodic evaluation of trends, deviations, severity, expectedness and possible benefit-risk impact.

04

Decision record

Agenda, inputs, conclusions, actions, owners, deadlines and the basis for closing each issue.

05

Periodic documents

Preparation or update of the PMS plan, PMS report, PSUR and related reviews using verifiable records.

06

Change control

Transfer of conclusions into risk management, clinical or performance evaluation, CAPA, labelling and technical documentation.

Bring different sources back to one question

What do the new data change in the known safety, performance and benefit-risk profile of this device?

We do not merely place data sources next to each other. Records are linked to a device model or group, market, period, exposure, known hazards and previous actions. This structure helps distinguish an isolated case from a recurring signal and shows why a particular decision was reached.

SourceContextReview
ComplaintModel · batch · marketExpectedness and recurrence
IncidentHarm · causality · outcomeVigilance and urgency
SalesUnits · patients · frequencyDenominator for trends
LiteratureDevice · similar · state of the artNew risk or new knowledge
PMCF or PMPFEndpoint · population · periodPerformance confirmation
CAPA and FSCACause · scope · statusAction effectiveness

Not every signal is an incident, but every signal needs a route

The next action should be timely, reproducible and based on predefined criteria.

MonitorRoutine loop

The data remain consistent with the known profile

The record enters the aggregated analysis and is reassessed at the next defined review.

InvestigateEnhanced review

There is a deviation or insufficient context

Additional review addresses data quality, causality, trend, exposure and links to known risks.

EscalateDo not await the report

Regulatory or corrective action may be required

The applicable vigilance, CAPA, FSCA or urgent safety and documentation assessment is initiated.

The report completes an analysis cycle but does not start it

Document frequency depends on the Regulation and device class. Material information is nevertheless assessed when it arrives, not only when the PMSR or PSUR is due.

MDR

Class I

The PMS report is updated when necessary.

MDR

Class IIa

The PSUR is updated at least every two years.

MDR

Classes IIb and III

The PSUR is updated at least annually.

IVDR

Classes A and B

The PMS report is updated when necessary.

IVDR

Classes C and D

The PSUR is updated at least annually.

Leave a verifiable trail for every cycle

The package depends on the agreed scope and maturity of the system. Every document should be supported by identifiable inputs and lead to a specific conclusion or action.

01

Source register

Coverage, owners, frequency, format and completeness controls.

02

PMS working dataset

Normalized records linked to the device, period and exposure.

03

Review record

Signals considered, decisions, rationale, actions and deadlines.

04

PMS plan

Methods, indicators, thresholds, responsibilities and process interfaces.

05

PMSR or PSUR

Consolidated results, the benefit-risk conclusion and the status of required action.

06

Update package

Affected documents, change owners and evidence of completion.

Connect support without rebuilding the whole system in one day

We first capture the actual data flow and the nearest regulatory output. Gaps are then addressed in an order that preserves the continuity of PMS.

01

Define the portfolio

Devices, markets, classes, certificates, reporting periods and responsible persons.

02

Review the flow

Sources, record quality, timelines, current procedures and open actions.

03

Agree the rhythm

Regular reviews, escalation thresholds, record format and urgent communication routes.

04

Release the first output

A priority review, report or remediation package with an agreed continuation plan.

External support does not transfer the manufacturer's responsibility

Manufacturer

Retains authority and responsibility

Provides access to complete data, approves procedures and conclusions, makes decisions and implements regulatory and corrective actions.

MDRC

Performs the agreed functions

Organises and analyses data, prepares controlled outputs, identifies limitations and escalates matters to the responsible persons in time.

Send each conclusion where it must change the system

PMS does not end when a report is issued. Material information must reach the relevant part of the quality system and technical documentation.

Operational PMS support

Can PMS activities be outsourced?

Defined PMS processes and tasks may be assigned to an external provider when responsibilities, access to data and control of the outputs are clear. Regulatory responsibility for the PMS system and decisions concerning the device remains with the manufacturer.

Is a PMS system required for a class I device or a class A IVD?

Yes. The requirement to maintain a PMS system proportionate to the device applies to every class. For class I devices under the MDR and class A and B IVDs under the IVDR, the results are documented in a PMS report that is updated when necessary.

Is preparing an annual PSUR sufficient?

No. The PSUR is a periodic output of the system, not a substitute for it. Data must be collected and evaluated continuously, and material signals, incidents and the need for corrective action cannot wait until the next reporting date.

Which data belong in PMS?

The dataset is determined by the device and its PMS plan. It commonly includes complaints and feedback, incidents and undesirable effects, information from distributors and importers, sales and usage data, literature, information on similar devices, PMCF or PMPF, and the results of corrective actions.

When should documents be updated outside the planned cycle?

An ad hoc assessment is needed when new information may change conclusions on safety, performance or the benefit-risk determination, or indicates a new risk, a trend, insufficient risk controls, or a need for corrective or preventive action.

Build PMS around decisions that cannot wait

Tell us the device types and classes, markets, next reporting deadline, available data sources and open questions. We will propose a support scope and the first controlled output.

Discuss the PMS operating model